Stansted Mountfitchet
| Station Name | Stansted Mountfitchet |
| Station Code | SST |
| Station Owner | Greater Anglia |
| Developable Area | 34.36ha |
| Development Capacity | 1,718 homes (at 50dph) |
| Local Planning Authority | Uttlesford |
| 2021 Housing Delivery Test - Homes Required | 1,848 |
| 2021 Housing Delivery Test - Homes Delivered | 1,830 |
| 2021 Housing Delivery Test - Score | 99% |
| 2021 Housing Delivery Test - Consequence | None |
| Green Belt | London |
| Green Belt Area | 34.35ha ( 99.97% of the potential development area) |
| Network Rail Region | East of England |
| Network Rail Sub-Region | Essex |
| Passengers, 2020 - 2021 | 150,136 |
| Passengers, 2019 - 2020 | 578,766 |
| UK Station Passenger Rank (Use) | 761 |
Development Potential
England's busiest station (apart from those serving airports) had 4,170,558 passenger movements in the period 2019-2020. The station with the least was 68. Stansted Mountfitchet station had 578,766 passengers enter or exit it during this period. That's roughly 1,590 people per day.
For a station with this number of passengers passing through it each year a density of 50 homes per hectare is reasonable, based on its proximity to major population centres and existing infrastructure.
Stansted Mountfitchet is located within the East of England railway region. The potential area for development around the station (excluding existing buildings, national parks, flood zones, public green space, protected habitats, areas of outstanding natural beauty, world heritage sites and surface water) is approximately 34.36ha.
Assuming an appropriate (but not prevailing) development density of 50 dwellings per hectare, this area has a development capacity of around 1,718 homes.
The station sits within Uttlesford planning authority, which in 2021 achieved a Housing Delivery Test Score of 99%, having delivered 1,830 homes from a target of 1,848. There are no consequences for the planning authority as a result.
The total capacity of all Uttlesford's stations is 19,466 homes. That's 1,053% of its total 2021 Housing Delivery Test requirement.
Taking green belt into account, the capacity of Uttlesford's stations is 17,748 homes without building on protected land. That's 960% of its total 2021 Housing Delivery Test requirement.
