Station Details

Stamford (Lincs)

Station NameStamford (Lincs)
Station CodeSMD
Station OwnerEast Midlands Railway
Developable Area16.94ha
Development Capacity847 homes (at 50dph)
Local Planning AuthoritySouth Kesteven
2021 Housing Delivery Test - Homes Required1,678
2021 Housing Delivery Test - Homes Delivered1,851
2021 Housing Delivery Test - Score110%
2021 Housing Delivery Test - ConsequenceNone
Network Rail RegionEast Midlands
Network Rail Sub-RegionLincolnshire
Passengers, 2020 - 202149,894
Passengers, 2019 - 2020366,652
UK Station Passenger Rank (Use)1,307

Development Potential

England's busiest station (apart from those serving airports) had 4,170,558 passenger movements in the period 2019-2020. The station with the least was 68. Stamford (Lincs) station had 366,652 passengers enter or exit it during this period. That's roughly 1,007 people per day.

For a station with this number of passengers passing through it each year a density of 50 homes per hectare is reasonable, based on its proximity to major population centres and existing infrastructure.

Stamford (Lincs) is located within the East Midlands railway region. The potential area for development around the station (excluding existing buildings, national parks, flood zones, public green space, protected habitats, areas of outstanding natural beauty, world heritage sites and surface water) is approximately 16.94ha.

Assuming an appropriate (but not prevailing) development density of 50 dwellings per hectare, this area has a development capacity of around 847 homes.

The station sits within South Kesteven planning authority, which in 2021 achieved a Housing Delivery Test Score of 110%, having delivered 1,851 homes from a target of 1,678. There are no consequences for the planning authority as a result.

The total capacity of all South Kesteven's stations is 1,955 homes. That's 116% of its total 2021 Housing Delivery Test requirement.

Taking green belt into account, the capacity of South Kesteven's stations is 1,955 homes without building on protected land. That's 116% of its total 2021 Housing Delivery Test requirement.