Station Details

Rickmansworth

Station NameRickmansworth
Station CodeRIC
Station OwnerLondon Underground
Developable Area21.05ha
Development Capacity1,579 homes (at 75dph)
Local Planning AuthorityThree Rivers
2021 Housing Delivery Test - Homes Required1,598
2021 Housing Delivery Test - Homes Delivered733
2021 Housing Delivery Test - Score46%
2021 Housing Delivery Test - ConsequencePresumption
Green BeltLondon
Green Belt Area21.05ha ( 100% of the potential development area)
Network Rail RegionEast of England
Network Rail Sub-RegionBedfordshire and Hertfordshire
Passengers, 2020 - 2021338,060
Passengers, 2019 - 20201,174,776
UK Station Passenger Rank (Use)461

Development Potential

England's busiest station (apart from those serving airports) had 4,170,558 passenger movements in the period 2019-2020. The station with the least was 68. Rickmansworth station had 1,174,776 passengers enter or exit it during this period. That's roughly 3,227 people per day.

For a station with this number of passengers passing through it each year a density of 75 homes per hectare is reasonable, based on its proximity to major population centres and existing infrastructure.

Rickmansworth is located within the East of England railway region. The potential area for development around the station (excluding existing buildings, national parks, flood zones, public green space, protected habitats, areas of outstanding natural beauty, world heritage sites and surface water) is approximately 21.05ha.

Assuming an appropriate (but not prevailing) development density of 75 dwellings per hectare, this area has a development capacity of around 1,579 homes.

The station sits within Three Rivers planning authority, which in 2021 achieved a Housing Delivery Test Score of 46%, having delivered 733 homes from a target of 1,598. As a result of this score, the authority is subject to a 'presumption in favour of sustainable development', according to the NPPF.

The total capacity of all Three Rivers's stations is 5,320 homes. That's 333% of its total 2021 Housing Delivery Test requirement.

Taking green belt into account, the capacity of Three Rivers's stations is 2,814 homes without building on protected land. That's 176% of its total 2021 Housing Delivery Test requirement.