MetroCentre
| Station Name | MetroCentre |
| Station Code | MCE |
| Station Owner | Northern Trains |
| Developable Area | 15.06ha |
| Development Capacity | 753 homes (at 50dph) |
| Local Planning Authority | Gateshead |
| 2021 Housing Delivery Test - Homes Required | 1,162 |
| 2021 Housing Delivery Test - Homes Delivered | 1,015 |
| 2021 Housing Delivery Test - Score | 87% |
| 2021 Housing Delivery Test - Consequence | Action plan |
| Green Belt | Tyne and Wear |
| Green Belt Area | 15.06ha ( 100% of the potential development area) |
| Network Rail Region | North East |
| Network Rail Sub-Region | Northumberland, and Tyne and Wear |
| Passengers, 2020 - 2021 | 61,036 |
| Passengers, 2019 - 2020 | 298,940 |
| UK Station Passenger Rank (Use) | 1,210 |
Development Potential
England's busiest station (apart from those serving airports) had 4,170,558 passenger movements in the period 2019-2020. The station with the least was 68. MetroCentre station had 298,940 passengers enter or exit it during this period. That's roughly 821 people per day.
For a station with this number of passengers passing through it each year a density of 50 homes per hectare is reasonable, based on its proximity to major population centres and existing infrastructure.
MetroCentre is located within the North East railway region. The potential area for development around the station (excluding existing buildings, national parks, flood zones, public green space, protected habitats, areas of outstanding natural beauty, world heritage sites and surface water) is approximately 15.06ha.
Assuming an appropriate (but not prevailing) development density of 50 dwellings per hectare, this area has a development capacity of around 753 homes.
The station sits within Gateshead planning authority, which in 2021 achieved a Housing Delivery Test Score of 87%, having delivered 1,015 homes from a target of 1,162. As a result of this score, the authority must produce an 'action plan' setting out how it intends to address this shortfall.
The total capacity of all Gateshead's stations is 753 homes. That's 65% of its total 2021 Housing Delivery Test requirement.
Taking green belt into account, the capacity of Gateshead's stations is 0 homes without building on protected land. That's 0% of its total 2021 Housing Delivery Test requirement.
