Station Details

Hurst Green

Station NameHurst Green
Station CodeHUR
Station OwnerGovia Thameslink Railway (Southern)
Developable Area10.63ha
Development Capacity532 homes (at 50dph)
Local Planning AuthorityTandridge
2021 Housing Delivery Test - Homes Required1,672
2021 Housing Delivery Test - Homes Delivered634
2021 Housing Delivery Test - Score38%
2021 Housing Delivery Test - ConsequencePresumption
Green BeltLondon
Green Belt Area10.63ha ( 100% of the potential development area)
Network Rail RegionSouth East
Network Rail Sub-RegionSurrey, East and West Sussex
Passengers, 2020 - 2021143,558
Passengers, 2019 - 2020682,128
UK Station Passenger Rank (Use)775

Development Potential

England's busiest station (apart from those serving airports) had 4,170,558 passenger movements in the period 2019-2020. The station with the least was 68. Hurst Green station had 682,128 passengers enter or exit it during this period. That's roughly 1,874 people per day.

For a station with this number of passengers passing through it each year a density of 50 homes per hectare is reasonable, based on its proximity to major population centres and existing infrastructure.

Hurst Green is located within the South East railway region. The potential area for development around the station (excluding existing buildings, national parks, flood zones, public green space, protected habitats, areas of outstanding natural beauty, world heritage sites and surface water) is approximately 10.63ha.

Assuming an appropriate (but not prevailing) development density of 50 dwellings per hectare, this area has a development capacity of around 532 homes.

The station sits within Tandridge planning authority, which in 2021 achieved a Housing Delivery Test Score of 38%, having delivered 634 homes from a target of 1,672. As a result of this score, the authority is subject to a 'presumption in favour of sustainable development', according to the NPPF.

The total capacity of all Tandridge's stations is 19,477 homes. That's 1,165% of its total 2021 Housing Delivery Test requirement.

Taking green belt into account, the capacity of Tandridge's stations is 1,599 homes without building on protected land. That's 96% of its total 2021 Housing Delivery Test requirement.