Elmswell
| Station Name | Elmswell |
| Station Code | ESW |
| Station Owner | Greater Anglia |
| Developable Area | 62.16ha |
| Development Capacity | 1,865 homes (at 30dph) |
| Local Planning Authority | Mid Suffolk |
| 2021 Housing Delivery Test - Homes Required | 1,450 |
| 2021 Housing Delivery Test - Homes Delivered | 1,985 |
| 2021 Housing Delivery Test - Score | 137% |
| 2021 Housing Delivery Test - Consequence | None |
| Network Rail Region | East of England |
| Network Rail Sub-Region | East Anglia |
| Passengers, 2020 - 2021 | 13,570 |
| Passengers, 2019 - 2020 | 71,050 |
| UK Station Passenger Rank (Use) | 1,920 |
Development Potential
England's busiest station (apart from those serving airports) had 4,170,558 passenger movements in the period 2019-2020. The station with the least was 68. Elmswell station had 71,050 passengers enter or exit it during this period. That's roughly 195 people per day.
For a station with this number of passengers passing through it each year a density of 30 homes per hectare is reasonable, based on its proximity to major population centres and existing infrastructure.
Elmswell is located within the East of England railway region. The potential area for development around the station (excluding existing buildings, national parks, flood zones, public green space, protected habitats, areas of outstanding natural beauty, world heritage sites and surface water) is approximately 62.16ha.
Assuming an appropriate (but not prevailing) development density of 30 dwellings per hectare, this area has a development capacity of around 1,865 homes.
The station sits within Mid Suffolk planning authority, which in 2021 achieved a Housing Delivery Test Score of 137%, having delivered 1,985 homes from a target of 1,450. There are no consequences for the planning authority as a result.
The total capacity of all Mid Suffolk's stations is 4,043 homes. That's 279% of its total 2021 Housing Delivery Test requirement.
Taking green belt into account, the capacity of Mid Suffolk's stations is 4,043 homes without building on protected land. That's 279% of its total 2021 Housing Delivery Test requirement.