Eccles Road
| Station Name | Eccles Road |
| Station Code | ECS |
| Station Owner | Greater Anglia |
| Developable Area | 118.09ha |
| Development Capacity | 590 homes (at 5dph) |
| Local Planning Authority | Breckland |
| 2021 Housing Delivery Test - Homes Required | 1,580 |
| 2021 Housing Delivery Test - Homes Delivered | 1,891 |
| 2021 Housing Delivery Test - Score | 120% |
| 2021 Housing Delivery Test - Consequence | None |
| Network Rail Region | East of England |
| Network Rail Sub-Region | East Anglia |
| Passengers, 2020 - 2021 | 296 |
| Passengers, 2019 - 2020 | 2,390 |
| UK Station Passenger Rank (Use) | 2,463 |
Development Potential
England's busiest station (apart from those serving airports) had 4,170,558 passenger movements in the period 2019-2020. The station with the least was 68. Eccles Road station had 2,390 passengers enter or exit it during this period. That's roughly 7 people per day.
For a station with this number of passengers passing through it each year a density of 5 homes per hectare is reasonable, based on its proximity to major population centres and existing infrastructure.
Eccles Road is located within the East of England railway region. The potential area for development around the station (excluding existing buildings, national parks, flood zones, public green space, protected habitats, areas of outstanding natural beauty, world heritage sites and surface water) is approximately 118.09ha.
Assuming an appropriate (but not prevailing) development density of 5 dwellings per hectare, this area has a development capacity of around 590 homes.
The station sits within Breckland planning authority, which in 2021 achieved a Housing Delivery Test Score of 120%, having delivered 1,891 homes from a target of 1,580. There are no consequences for the planning authority as a result.
The total capacity of all Breckland's stations is 1,888 homes. That's 119% of its total 2021 Housing Delivery Test requirement.
Taking green belt into account, the capacity of Breckland's stations is 1,888 homes without building on protected land. That's 119% of its total 2021 Housing Delivery Test requirement.
